Projects
2023 Mullen Rd Sewer Improvements

Project Background
This contract provides for the installation of approximately 2,000 LF of 2-inch and 8-inch diameter sewer force main, water valve removal and replacement and street reconstruction with fiber reinforced hot mix asphalt on Mullen Rd SE. Work to include pavement removal, paving, adjustment of utility appurtenances, striping, water service line, meters, water valves, hydrant assemblies, connections to existing water system, sewer force main abandonments, sewer service line, sewer valves, pig launch ports, side sewer stubs, connections to existing sewer force main and lawn restoration and other work.
Paving will occur beginning Monday, July 31st at 7:00 AM. Traffic will be reduced to one lane; please avoid this area and use alternate routes if possible.
If you have any immediate construction concerns you can call the Project Inspector, Bogdan Tirtu, at (564) 669-4339.
Mobilization on Monday, May 15.
Miles Resources, LLC is working to prepare for and connect new utilities in the areas of Mullen Rd SE between Rosemont Ct SE and Afflerbaugh Dr SE. Location can be seen highlighted in the picture below.
Work performed on this project includes pavement removal, paving, adjustment of utility appurtenances, striping, water service line, meters, water valves, hydrant assemblies, connections to existing water system, sewer force main abandonments, sewer service line, sewer valves, pig launch ports, side sewer stubs, connections to existing sewer force main and lawn restoration and other work.
Contractor will be mobilizing on site on Monday, May 15. There is no night work on this project. Expect traffic delays and temporary lane closures over the next few months; Use alternate routes if possible.
If you have any immediate construction concerns you can call the project inspector, Dave Weissenfluh, at (360) 701-9015.
July 26, 2023
Paving Starts Monday July 31st
Paving will occur beginning Monday, July 31st at 7:00 AM. Traffic will be reduced to one lane; please avoid this area and use alternate routes if possible.
If you have any immediate construction concerns you can call the Project Inspector, Bogdan Tirtu, at (564) 669-4339.
May 10, 2023
Mobilization - Monday, May 15
Miles Resources, LLC is working to prepare for and connect new utilities in the areas of Mullen Rd SE between Rosemont Ct SE and Afflerbaugh Dr SE. Location can be seen highlighted in the picture below.
Work performed on this project includes pavement removal, paving, adjustment of utility appurtenances, striping, water service line, meters, water valves, hydrant assemblies, connections to existing water system, sewer force main abandonments, sewer service line, sewer valves, pig launch ports, side sewer stubs, connections to existing sewer force main and lawn restoration and other work.
Contractor will be mobilizing on site on Monday, May 15. There is no night work on this project. Expect traffic delays and temporary lane closures over the next few months; Use alternate routes if possible.
If you have any immediate construction concerns you can call the project inspector, Dave Weissenfluh, at (360) 701-9015.