Project Background

This contract provides for the replacement and addition of drinking water distribution system valves scattered throughout the City’s water service area. Work will include excavating in streets and sidewalks, replacing and/or adding valves, and restoring disturbed surfaces back to pre-construction conditions. Work is set to begin on 9/11/2024.

Project Site Locations or nearby addresses
1. Sleater Kinney Road NE and 15th Avenue NE
2. 6th Avenue SE and Woodland Square Loop SE
3. College Street SE and Gateway Lane SE
4. 4830 Yelm Highway SE (Near College and Yelm)
5. Rumac Street SE and Alder Glen Dr SE
6. 8001 Martin Way E (Near Martin and Galaxy)

Due to schedule constraints associated with the first site listed above, this project was split into two contracts with the following contractors:
Rickabaugh Penetecost Development, LLC
Baker Underground & Construction, LLC

If you have any coordination or construction issues you can contact the City of Lacey project inspector, Bogdan Tirtu, at 564-669-4339.