Projects

S06 Water Rights Exploratory Drilling

4902 23rd Ave SE, Olympia, WA 98503, USA

Public Works Projects

Department: Public Works

Project Background

This contract provides for the completion of three geotechnical boreholes, to a depth of approximately 600 feet, 600 feet, and 300 feet or less. The test holes shall be drilled using sonic drilling equipment with continuous sample collection. Contractor shall provide minimally-disturbing clearing or grading activities to provide rig access to each borehole, and shall restore site conditions and landscaping upon completion. Locations S6E2 and S6E3 shall be completed as 2-inch diameter groundwater monitoring wells.

Sign up for S06 Water Rights Exploratory Drilling Email Notifications:        *


By submitting this form, you are consenting to receive marketing emails from: City of Lacey, 420 College St. SE, Lacey, WA, 98503, http://www.ci.lacey.wa.us. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact